Page 17 - Issue 22
P. 17

In The News                       17



 Sea Rail to facilitate   is  a  common  user  facility  with  public  into inter-modal short and long distance  designed to have a cold storage facility
          authority  status,  equipped  with  fixed  flows  and  Improve  cargo  processing  with the potential to handle +/- 10,000
          installations  and  offering  services  for  through  coordinated  operations.  The  tons annually. The port has introduced
 collection , distribution   handling and temporary storage of any  dry  port  was  intended  to  facilitate  maximum-security   measures   and
          kind  of  goods  (including  containers)  collection  and  distribution  as  well  as  procedures  and  is  International  Ship
          carried  under  customs  transit.  This  integrate  Botswana  and  the  SADC  and  Port  Facility  Security  code  (ISPS)
          can  be  by  any  applicable  mode  of  region  with  the  Walvis  Bay  Port.  In  compliant.  The  turnaround  time  for
 and integrate Botswana   transport placed under customs control  short  it  was  to  provide  the  catalyst  container vessels is 12 to 15 hours.
          and  with  customs  and  other  agencies  to  Botswana’s  growing  economy  by
          competent to clear goods for home use,  creating  appropriate  infrastructure,   The Port of Walvis Bay is a congestion-
 and the SADC region  warehousing, temporary admissions, re-  processes  and  a  supportive  regulatory  free  port  with  minimum  delays.  The
          export,  temporary  storage  for  onward  environment to encourage international  port currently handles5 million tonnes.
                                              trade.
                                                                                 Its total capacity equips it to handle 7 to
          transit and outright export.
                                                                                 8 million tonnes of cargo. Shipping time
          Background                          “Sea Rail has a vision to be the leading  from  Europe  is  typically  8  days  faster
          The Government of Botswana acquired  provider  of  transport  and  logistics  when going to Walvis Bay as compared
          leased  land  of  36,233  sqm  from  solutions  for  importers  and  exporters  to  Durban.  Due  to  the  proximity  to
          the  Namibian  Government  in  2009  globally by providing efficient, safe and  the  west,  shipping  costs  to  and  from
          specifically meant to put up a dry port  cost effective port services,” he said. He  Walvis  Bay  are  the  most  competitive
          facility  directly  connected  to  the  Port  went  on  to  list  their  business  product  in  the  region.  Trucking  costs  are  very
          of  Walvis  Bay  as  an  alternative  route  offering  and  it  included  container  and  competitive  when  compared  to  other
          for  Botswana’s  imports  and  exports.  breakbulk  handling,  as  well  as  Ro-Ro  routes  in  the  region.  Handling  fees
          Subsequently  the  Government  of  Vehicle  handling  and  project  cargo  are one of the most reasonable in the
          Botswana  gave  Botswana  Railways  a  handling.                       region.
          mandate  to  develop  and  run  the  Dry
          Port,  which  led  to  the  establishment  The Infrastructure          Mr    Mokgatle  assured  the  attendees
          of  Sea-Rail  (Botswana)  (Pty)  Limited  The dry port is 36,200 sqm and there are  that,  “At  Sea  Rail  we  pride  ourselves
          which  is  registered  in  Namibia.  The  300 parking bays which can handle 4,800  in ensuring the customers get the best
          dry  port  infrastructure  was  developed  cars  annually.  The  facility  is  designed  possible  service.  The  management
          from 2013 to 2014 and it was opened  to  have  general  warehousing  as  well  team  have  an  open  relationship  with
          for  operations  on  September  01,  as  the  potential  to  develop  specialize  customers and our customers are seen
          2014, after completion of the Dry Port  warehousing.  It  is  able  to  handle  a  as partners rather than customers.”
          infrastructure                      combined tonnage of 80,000 tons. The
                                              dry port has a container freight station
          The  overall  objectives  of  the  project  which can handle 17,000 TEUs annually.
          were  to  consolidate  maritime  goods  Most  impressive  feature  is  that  it  is










                                                                                           Sea Rail;

                                                                                       working with

                                                                                               you,

                                                                                             for you





          Botswana port in Namibia




 Issue 22   - Jun/Jul 2019  www.engineermagazine.co.bw  www.engineermagazine.co.bw             Issue 22   - Jun/Jul 2019
   12   13   14   15   16   17   18   19   20   21   22